Project 
No 
Full Title of the Project Type of Document  
 
 B1  Interim Storage of Spent Nuclear Fuel from Ignalina NPP RBMK Units 1 and 2   Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
 
 B19  Landfill Facility for Short-lived Very Low Level Waste   Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
 
 B234  New Solid Waste Management and Storage Facility at Ignalina NPP   Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
 
 B25  Near Surface Repository for Low and Intermediate Level Short-lived Radioactive Waste    Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
 
 B9-0  INPP Building 117/1 Equipment Decontamination and Dismantling   Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
 
 U1DP0  INPP Unit 1 Decommissioning Project for Defuelling Phase   Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
 
 U2DP0  Decommissioning Project for INPP Unit 2 Final Shutdown and Defuelling Phase   Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
       
 B9-1 INPP Unit 1 Turbine Hall Equipment Decontamination and Dismantling Project Development  Environmental Impact Assessment Report (Final Version)  
     Resolution of the Ministry of Environment  
       
B9-2 INPP Building V1 Equipment Dismantling and Decontamination Design Development   Environmental Impact Assessment Report (Final Version, Lithuanian)  
     Resolution of the Environmental Protection Agency  
       
B9-5 INPP Boiler House Equipment Dismantling and Decontamination Design Development   Environmental Impact Assessment Report (Final Version, Lithuanian)  
     Resolution of the Environmental Protection Agency  
       
2207, 2208, 2214   Ignalina NPP D-0, D-1 and D-2 Units Equipment Dismantling and Decontamination    Environmental Impact Assessment Report (Final Version, Lithuanian)  
     Resolution of the Environmental Protection Agency  
 